Planning Parent Guide Construction Projects NS Disctrict Emergency Information Guide
John Hall
Director Facilites & Operations
516-277-7835
EMAIL
Mission Statement
The Buildings and Grounds department is responsible for the maintenance and operations of seven buildings and several out buildings totaling 520,000 square feet and over 65 acres of grounds. We are committed to providing a clean and safe environment for the students, faculty and staff.
The North Shore Buildings and Grounds Department will work closely with BBS Architects, Landscape Architects & Engineers and Savin Engineers PC, Construction Managers. We will meet weekly with all of the contractors to keep the projects moving forward and have them completed on time. The Construction Steering Committee will meet monthly or more as needed to keep the Board of Education up to date on our progress.
The Buildings and Grounds staff will also work diligently towards completing all of the projects outlined in the 2017-2018 budget. It is our goal to utilize the summer months to complete as much work as possible. This will be in conjunction with the normal summer cleaning of all of the building to ready them for the next school year.
Capital Reserve Projects Capital Projects
-
Installation of air conditioning in GH (library & cafeteria), GWL (auditorium & library), and MS (cafetorium). All units are installed and will be operational by the start of school, with the exception of the MS Cafetorium unit. The MS Duct work and infrastructure are now in place, but the rooftop AC unit will not be shipped for installation until mid-September.
The following projects will be bid in the Fall 2019: Installation of air conditioning for SC (cafeteria) and HS (gym and HVAC upgrades in the cafeteria)
Security Projects
Summer 2023- Bond Phase 2C, Continue Construction of the New Secure Vestibule Main Entrance Addition on the High School. The project is scheduled for completion in late August 2023.
Bond Projects
We continue the last phase of the Bond Projects DW. Elementary School work scheduled for Summer 2023 is on pause, as the district works through workforce issues. More information to follow. The High School Bond Phase 2D & E scope includes Choral Room, Band Room, and Orchestra Room renovations. A new Music Lab is being created as well. Remaining bathrooms will be renovated and the ceiling in the Athletic Wing Hall will be replaced. It is our goal to complete the remainder of work from the Summer 2022 Bond 2B scope and open in September 2023 with the entire scope of bond work substantially completed in the High School.
Energy Performance Contract Projects
Solar Panel Installations are complete on Glen Head School and North Shore Middle School.We anticipatethe completion of the North Shore High School solar panel installation by the end of August 2023. All other energy savings measures are in place and in punch list phase. We look forward to completing all EPC work by the end of August 2023.
Key Contacts
TITLE | NAME | ||
---|---|---|---|
NORTH SHORE HIGH SCHOOL 450 GLEN COVE AVENUE GLEN HEAD, NY 11545 |
Head Custodian: Jerry Boertzel Office: (516) 277-7094 |
||
GLENWOOD LANDING SCHOOL 60 CODY AVENUE GLEN HEAD, NY 11545 |
Head Custodian: Alfredo Montero Office: (516) 277-7632 |
||
GLEN HEAD SCHOOL 7 SCHOOL STREET GLEN HEAD, NY 11545 |
Head Custodian: Bob Kemp Office: (516) 277-7728 Cell: (516) 852-9419 |
||
NORTH SHORE MIDDLE SCHOOL 505 GLEN COVE AVENUE GLEN HEAD, NY 11545 |
Head Custodian: Balkaran Balwant Office: (516) 277-7341 Cell: (516) 852-3860 |
||
SEA CLIFF SCHOOL 280 CARPENTER AVENUE SEA CLIFF, NY 11579 |
Head Custodian: Doug Arena Office: (516) 277-7530 Cell: (516) 852-0723 |
||
TRANSPORTATION 340 SHORE RD. GLENWOOD LDG. NY 11547 |
Supervisor: Michele Hall Office: (516) 277-7930 |
||
ADMINISTRATION 112 FRANKLIN AVE SEA CLIFF, NY 11579 |
Director of Facilities: John Hall Office: (516) 277-7835 Cell: (516) 852-4334 |
||
Head of Maintenance: Gerard Pascucci Office: (516) 277-7729 Cell: (516) 322-5028 |
Website Link Information
NYS Education Department Facilities: http://www.p12.nysed.gov/facplan/home.html
Nassau BOCES:http://www.nassauboces.org/site/default.aspx?PageID=1
National Weather Service: http://www.noaa.gov/weather